Search This Blog

Sunday 27 September 2015

Flooring

The chimney at the end of the house was removed when we had the other two chimneys rebuilt, the removal was done down to the floor. The hearth was removed, and this left a hole in the floor. Self leveling compound filled in the space left by the hearth removal, and now I've finished the flooring of the hole left in the bamboo floor.





The skirting was next, then a repaint of the entire room.

No comments: